| Version number | Document status | Author initial | Prepared date | Checked by initial | Checked date | Approved by initial | Approved date | Revision details |
|---|---|---|---|---|---|---|---|---|
| A | Draft | MR | 11/11/2025 | CW | 06/05/2026 | SM | 18/06/2026 | |
| B | Final | SB | 24/06/2026 | CW | 08/07/2026 | LJ | 07/08/2026 |
1 Introduction
1.1 The purpose of the Design and Access Statement (DAS)
1.2 The Applicant and the Consultant
1.3 Consenting route
1.4 The structure of the DAS
2 The Proposed Development
2.1 Site Location
2.2 Description of the Proposed Development
2.3 Planning History
2.4 Site Constraints
2.5 Consultation and Engagement
3 Design Policies
3.1 National Policy
3.2 Local Policy
3.3 Other relevant documentation
4 Design Principles
4.1 The Iterative Design Process
4.2 The Design Strategy
4.3 The Design Principles
4.4 Technical Design Considerations
5 Design Evolution
5.1 The Needs case
5.2 Consideration of Alternatives
5.3 Design Iterations
5.4 Consideration of other infrastructure
5.5 Other Considerations
6 Access
6.1 Onsite Access Tracks
6.2 Public Access (and access during operation)
7 Conclusion